Cendor Mopu - CDW-B Water Injection (WI) Facilities Upgrading Work Study


Client: Petrofac Malaysia Limited (PML)
End user: Petrofac Malaysia Limited (PML)

Scope of Work
  • Detailed engineering study to upgrade existing water injection system from 25,000 bwpd up to 40,000 bwpd.
  • Responsible in performing site visit and site survey.
  • Provide modification drawings, 3D modelling and develop equipment and datasheet specifications. Provision of construction management services